Celebrating a Milestone, Altius Hospital Puri Holds Topping Off Ceremony and Prepares to Begin Operations in October 2026
JAKARTA, December 30, 2026 – Altius Hospital Puri today officially conducted its topping off ceremony, marking the completion of the main building’s structural construction phase. This achievement represents a major step toward the hospital’s final completion stage before its official opening to serve the public in October 2026.
This ceremony underscores Altius Hospital’s commitment to delivering a modern, grand, and comprehensive healthcare facility in the strategic area of West Jakarta.
Large-Scale Facility in the Heart of Puri Indah
Situated on a 35,000-square-meter plot of land, Altius Hospital Puri comprises a 12-story building complemented by 3 basement levels. The building’s architecture is designed according to international standards to ensure efficient, safe, and comfortable patient flow.
The topping off ceremony of Altius Hospital Puri is not merely a construction milestone, but a tangible reflection of Altius Hospital’s vision to build an outstanding healthcare ecosystem. The building infrastructure has also been carefully planned to support the most advanced medical technologies.
Readiness of Leading Medical Services
Alongside the completion of the building structure, Altius Hospital Puri continues to strengthen its team of medical professionals. To date, more than 80 specialist doctors have joined and are ready to provide multidisciplinary medical services.
To support the performance of these specialists, Altius Hospital Puri is equipped with highly capable facilities:
Inpatient Capacity: Total of more than 100 beds, ranging from Premium Class and VIP to Presidential Suite.
Intensive Care (ICU, PICU, NICU): 20 beds available, along with a High Care Intensive Cardiac Unit with 25 beds, fully equipped to handle emergency and critical cases.
Outpatient Services: 55 polyclinics ready to serve a wide range of specialist consultations.
Advanced Medical Interventions: Equipped with 5 Operating Theaters (OT) and 2 Cath Labs for fast and precise treatment of cardiac and vascular cases.
Operational Target: October 2026
Following this topping off phase, Altius Hospital Puri will soon enter the stage of installing high-tech medical equipment and completing interior design that emphasizes a healing environment. With progress on track, management is optimistic about welcoming its first patients in October 2026.